Lived on-board Hadar

Daisypath Vacation tickers

Wednesday, September 13, 2017

Work in the Hold

Today we started preparatory work for building my model railway room in the hold. First we had to sort out the rubbish, which went in the bins, then moved everything as far forward as possible, which allowed us access to and removal of the first two shutts (floorboards) from the bulkhead at the saloon end of the hold.

IMG_4922

IMG_4926

IMG_4928

IMG_4930

It is in better condition than we thought it might be. Jo set about scraping and removing the loose bits, then painted the base of the walls. It is already for oiling tomorrow morning, then we can do under the next 2 shutts. We thought that whilst we had the shutts up it was lagging the main water pipe from the water tank in the bow with some pipe insulation, to stop the condensation which appears to be happening, so I popped to Screwfix to get some and have fitted the first lengths.

Keith.

No comments: